Day/Time
|
Location
|
Shot description
|
People Needed
|
Monday 26th October PM
|
Bedroom
|
Close up of the lead singer singing into camera and breaking the fourth wall.
|
Lead singer, camera man
|
Kitchen
|
Close up on the radio. Mid shot of the lead singer performing to the camera.
|
Lead singer, camera man
| |
Stairs
|
Mid shot of the lead singer walking up the stairs, singing.
|
Lead singer, camera man
| |
Garage
|
Close ups on all band members, long shots of band preforming and panning of the band.
|
All band members, camera man
| |
Wednesday 11th November PM
|
Woods
|
Long shot of the drummer singing into the camera and breaking the fourth wall.
|
Drummer, camera
|
Woods- bench
|
Mid shot of the drummer singing into the camera and breaking the fourth wall.
|
Drummer, camera
| |
Woods- bench
|
Close up of the drummer singing.
|
Drummer, camera
| |
Sunday 15th November PM
|
Swimming pool
|
Mid shot of all of the band members walking down the swimming pool singing.
|
All band members, camera man
|
Swimming pool
|
Mid shot of each individual band member singing.
|
All band members, camera man
| |
Swimming pool
|
Long shot of the band jumping into the pool.
|
All band members, camera man
| |
Swimming pool
|
Mid shot of all band members sat on the side of the pool.
|
All band members, camera man
| |
Thursday 26th November PM
|
Room
|
Mid shot of the guitarist getting ready.
|
Guitarist and camera man
|
Street
|
Long shot of the guitarist walking down a street.
|
Guitarist and camera man
| |
Restaurant
|
Close up on the band member breaking the fourth wall.
|
Guitarist and camera man
|
Tuesday, 8 September 2015
A2 Media Coursework - Filming Schedule
Subscribe to:
Post Comments (Atom)
Be much more specific here- could you do a screenshot of a calendar and do a tighter schedule with achievable tasks and targets?
ReplyDelete